"

欧洲杯2021开赛时间-欧洲杯2021举办地-欧洲杯2021决赛地拥有全球最顶尖的原生APP,每天为您提供千场精彩体育赛事,欧洲杯2021开赛时间-欧洲杯2021举办地-欧洲杯2021决赛地更有真人、彩票、电子老虎机、真人电子竞技游戏等多种娱乐方式选择,欧洲杯2021开赛时间-欧洲杯2021举办地-欧洲杯2021决赛地让您尽享娱乐、赛事投注等,且无后顾之忧!

  • "
    Welcome to Greatoo Intelligent Equipment Inc.
    Product Center

    Product Center

    The current position:  

    Product Center>Intelligent Production Line
    • 大小.jpg

    Automatic electrode flexible production line

    Product Features:

    Flexible production line automation electrode by four Fagor system three-axis electrode processing center, one 20 kg six degrees of freedom, industrial robot, 1 of article 15 meters of linear guide, 80 location library the workpiece and the security fence, security door and related peripheral equipment. Production line is controlled by a set of flexible production management system, implementation: the staff use PC after distribution processing tasks, the production department management system according to robots and CNC automatic scheduling task information, to realize automatic robot for CNC automatic up-down and CNC machining, under the condition of a single intervention to complete the function of automatic production.

    Product description

    System Components

    Flexible production line automation electrode by four Fagor system three-axis electrode processing center, one 20 kg six degrees of freedom, industrial robot, 1 of article 15 meters of linear guide, 80 location library the workpiece and the security fence, security door and related peripheral equipment. Production line is controlled by a set of flexible production management system, implementation: the staff use PC after distribution processing tasks, the production department management system according to robots and CNC automatic scheduling task information, to realize automatic robot for CNC automatic up-down and CNC machining, under the condition of a single intervention to complete the function of automatic production.
    Equipment use: used to implement the graphite electrode processing automation
    Class 3 continuous production equipment using divisions: 7 days/week
    Equipment using the environment:
    Temperature: Max. 50 ° C relative humidity: Max. 95%
    Energy:
    Power supply: three-phase ac 380 v, 220 v communication
    Compressed air: 0.6 Mpa to 0.7 Mpa


    欧洲杯2021开赛时间-欧洲杯2021举办地-欧洲杯2021决赛地